Skip to main content

Table 2 Characteristics of health facilities using the electronic immunization registry (EIR) in Tanzania (TZ) and Zambia (ZA), by region and province

From: Perceptions of factors influencing the introduction and adoption of electronic immunization registries in Tanzania and Zambia: a mixed methods study

Characteristics

Arusha, TZ

Kilimanjaro, TZ

Tanga, TZ

All Regions, TZ

Southern Province, ZA

Number of districts

6

6

8

20

13

Number of facilities

283

292

330

905

302

Number of patients

137,130

35,084

89,740

261,954

96,617

Time since EIR Introduction5

27 months

9 months

14 months

NA

14 months

EIR use percentage weeks active post-rollout, median [IQR]

71% [32%, 86%]

64% [40%, 80%]

73% [42%, 87%]

70% [39%, 87%]

40% [24%, 59%]

Primary power source, n (col%) 1

 Grid

102 (37%)

226 (79%)

-

328 (36%)

123 (41%)

 Solar

87 (31%)

22 (8%)

-

109 (12%)

5 (2%)

 None

11 (4%)

-

-

11 (1%)

144 (48%)

Number of HCWs per facility, mean (SD)2

2 (1)

2 (1)

3 (1)

2 (1)

-

Distance to regional DHO, km, mean (SD)

40 (32)

63 (174)

23 (14)

41 (102)

49.4 (27.5)

Ownership type, n (col %)3

 Private—FBO

90 (32%)

70 (25%)

40 (12%)

199 (22%)

-

 Public—Government

181 (65%)

201 (71%)

279 (86%)

661 (74%)

-

Facility type, n (col %)4

 Dispensary/health post

218 (78%)

226 (79%)

282 (87%)

726 (82%)

47 (16%)

 Health center

47 (17%)

45 (16%)

36 (11%)

128 (14%)

219 (73%)

 Hospital

13 (5%)

14 (5%)

8 (2%)

35 (4%)

6 (2%)

  1. Amongst those facilities that have input at least one record into the EIR
  2. 1Facilities missing data on primary power source: in Arusha (n = 78), Kilimanjaro (n = 37), and Tanga (n = 327); in Southern Province (n = 30), percentages will not add up to 100%
  3. 2Missing data regarding average number of HCWs in facilities in Southern Province, Zambia, percentages will not add up to 100%
  4. 3Facilities missing data on ownership type: in Arusha (n = 7), Kilimanjaro (n = 14), and Tanga (n = 8); in Southern Province (n = 302), percentages will not add up to 100%
  5. 4Facilities missing data on facility type: in Arusha (n = 0), Kilimanjaro (n = 14), and Tanga (n = 36); in Southern Province (n = 31), percentages will not add up to 100%
  6. 5Number of months since introduction of the first EIR system in at least one facility within a region or province to the time the key informant interviews were conducted (September 2018); TZ Introduction Dates: Arusha—June 2016, Kilimanjaro—December 2017, and Tanga—July 2017; Zambia Introduction Dates: July 2017; it took from 1 to 12 months for the EIR to be rolled out to all facilities within each region