Site | Personnel | Medications | Materials | Training | Technology | Equipment | Other | Total cost | Reporting periods |
---|---|---|---|---|---|---|---|---|---|
1 | 10,307 (95.1) | – | 17 (0.2) | – | 513 (4.7) | – | – | 10,838 | 2 |
2 | 19,794 (95.4) | – | 131 (0.6) | 282 (1.4) | 171 (0.8) | 79 (0.4) | 337 (1.6) | 20,751 | 3 |
3 | 6878 (62.3) | – | – | – | 4167 (37.7) | – | – | 11,045 | 1 |
4 | 11,744 (90.0) | – | – | 513 (3.9) | 257 (2.0) | 539 (4.1) | – | 13,052 | 1 |
5 | 13,518 (95.5) | – | 6 (0.0) | 175 (1.2) | – | 453 (3.2) | – | 14,152 | 3 |
6 | 17,542 (99.0) | – | 168 (1.0) | – | – | – | – | 17,710 | 2 |
7 | 8400 (90.2) | 454 (4.9) | 7 (0.1) | 134 (1.4) | – | 268 (2.9) | 50 (0.5) | 9314 | 1 |
8 | 6641 (86.9) | – | – | 390 (5.1) | – | 611 (8.0) | – | 7642 | 1 |
9 | 17,455 (92.8) | 17 (0.1) | 35 (0.2) | 485 (2.6) | – | 537 (2.9) | 288 (1.5) | 18,817 | 3 |
10 | 5881 (91.1) | – | – | 376 (5.8) | – | 196 (3.0) | – | 6453 | 1 |
11 | 11,046 (97.2) | – | 178 (1.6) | 96 (0.8) | – | 10 (0.1) | 36 (0.3) | 11,367 | 3 |
12 | 8346 (82.7) | 573 (5.7) | 366 (3.7) | 377 (3.8) | – | 227 (2.3) | 122 (1.2) | 10,010 | 3 |
13 | 4558 (88.9) | – | – | 220 (4.3) | – | 186 (3.6) | 164 (3.2) | 5129 | 2 |
14 | 4122 (48.8) | 121 (1.4) | 309 (3.7) | 516 (6.1) | 2759 (32.7) | 620 (7.3) | – | 8447 | 2 |
15 | 14,103 (87.9) | 51 (0.3) | 435 (2.7) | 359 (2.2) | 889 (5.4) | 209 (1.3) | – | 16,046 | 1 |
Median | 10,307 (90.0) | 0 | 17 (0.1) | 282 (2.2) | 0 | 209 (1.6) | 0 | 11,045 | Â |
Minimum | 4122 | 0 | 0 | 0 | 0 | 10 | 0 | 5129 | Â |
Maximum | 19,794 | 573 | 435 | 516 | 4167 | 620 | 337 | 20,751 | Â |